Read a deliverable and see how it was made
Select a deliverable in Delivered to read it. A card under its title says how its review went. Below the preview, four sections hold the rest: Review, What it was for, What it drew on and Record.
Steps
- Go to Delivered and select a deliverable.
- Read it in the preview. The line under the title gives its goal, its Role and its date.
- Read the card under that line. It says whether the deliverable passed its review, had changes asked for, or isn't reviewed. Select Read the review to open the review.
- Below the preview, select a section to open it. One opens at a time. Select it again to close it.
What you'll see
- Review: the review in full, with its result, the Role that reviewed it and the date.
- What it was for: the goal, and what the work had to meet.
- What it drew on: the findings it used. Select Open in Knowledge to read one.
- Record: the Role, the Delivered date, the Version and the Cost, then the proposal behind the work and how it was checked: Required parts present and Judged against each condition, each marked Met or Not met. Select Show the record exactly as stored to see the raw record.
- Cost is the cost of the work that produced it, marked "est." when estimated. Version links to the other versions.
Each deliverable opens with its sections closed.
If something's different
- "A newer version has replaced this one." Select Open the current version.
- Not reviewed. means no Role reviews this goal's work. Its review hasn't come in yet. means one does, and the result shows here once it's handed in.
- A value that reads Not recorded wasn't kept for this deliverable.
- The record for this work isn't available. means Axiom has nothing to show about how this one was made.
Still stuck? In the app, open Help and choose Email support.
Related
Checked against the product on 11 November 2026
Still stuck?
Tell us what you were trying to do and we'll help.
